Monday, October 17, 2011

The Work Continues

Sunday was a pleasant change of pace. Our team joined Dan, Joy and
Heidi (a short term missionary who is working with Joy) for a worship
service. A restful afternoon was followed by a refreshing dip in the
channel. The water near the shore is crystal clear (quite different from
Petit Goave); one can clearly see through 4 feet of water.

Monday has been another busy day. Work continued on the stairway
posts; each one needed to be custom fit to the existing holes in the stair
treads. Another coat of paint was carefully applied to the white-washed
walls. A scaffold was disassembled for its lumber. Electrical wiring for
the generator and in the circuit breaker panels was upgraded. The
washing machine was installed and connected. Tomorrow is another day.