Another work day is history. A doorway framed; more posts
painted; more batteries tested. 1x2 strips were ripped from a 2x6 to
make sides for screen frames. Two frames were assembled,
covered with screen and installed. A ground rod was cut from a
piece of rebar, sunk in the ground and connected to the generator. It
will be good to have a day off tomorrow.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment