Progress continued on the several projects that are underway. The
stairway posts have been set in place. The decorative wrought iron
panels between the posts have been attached. A top rail was set in
place.
A new pump was installed in the large cistern in the second building
on the property. The other day plumbing was installed to allow the
cistern in the main building to be filled from the cistern in the second
building.
Additional wiring was cleaned up; the cook's bedroom now has a
functional duplex outlet so a floor fan would keep the temperature
tolerable as long as electricity is available. Dead bolts were added to
the new doors. The cache of batteries for the power tools was
inventoried and recharged.