The day began with removal of the doors from the large work table so it would be easier to move. After hanging around for a while waiting for the truck to arrive, we went looking for other assignments.
The rest of the morning and most of the afternoon were spent troubleshooting the wiring in one of the relatively new apartments. Several of the duplex outlets were wired with reverse polarity; another outlet had loose connections that disabled the other daisy chained outlets. A completely dead ceiling light led to the discovery that two adjacent light switches were mis-wired. One switch was wired with the hot lead from two different cables; the other switch was wired with the switched lamp feed from those same two cables.
A late afternoon visit to the hospital revealed that the cabinets and piece parts had been moved to the new hospital. Unfortunately, we will not be around to witness the move of the large table.