Thursday, September 13, 2012

At Fontina - Part 2

Sunday:
After a visit to the OKIPE Children's Village, we headed back up the mountain to Fontina.  It took an hour and fifteen minutes to travel the 4.5 miles.


Monday:
It was a long day of setting forms, pouring concrete, moving forms, pouring concrete.  After 9 hours of work we had the 2 long sides and one end completed with 8' of concrete.


Tuesday:
Continued work on the second lift; by 2:30 pm the second lift was complete.  The third lift extends about 2' to the header boards at the base of the roof trusses. Another 9-hour day resulted in the completion of one side.


Wednesday:
The morning was devoted to completing the third lift above the main entrance.  Our work had come to a close.  Over the next few days the Haitian mason and several local laborers will be able to complete the third lift.  Several windows and doors were already on site, and a Haitian welder will  set them in place and attach them to the rebar.

In addition  to the concrete work, a few of the team members refurbished a swing set and sliding board.

It has been a tiring but rewarding experience.  The Pastor and director of the school were very grateful for our work.  The local folks have been most welcoming.  We have been blessed beyond description.

No comments:

Post a Comment