Tuesday, March 1, 2011

A Good Days Work

A second coat of sealant was applied to the station manager's house roof. Two windows in a storage area were boarded up, caulked, and painted in preparation for storing bags of concrete. More propane tanks were cleaned and painted. A ceiling in one of the apartments showed signs of significant deterioration and termite damage. The attic floor was vacuumed and a few reinforcement boards were set in place in preparation for a new ceiling panel. Throughout the day there were opportunities to share with the missionary families and to renew friendships with nationals we have met on previous trips. Several trips to other ministries in the area are being planned.

No comments:

Post a Comment